Products
MV-LC0007 Compact Bridge-Output Load Pin, up to 3 t
video
MV-LC0007 Compact Bridge-Output Load Pin, up to 3 t

MV-LC0007 Compact Bridge-Output Load Pin, up to 3 t

Brand: METRAVON

Model: MV-LC0007

Output: 1.0 +/-0.015 mV/V bridge; no direct process or bus output established

Power Supply: 10-12 V DC bridge excitation

Ingress Protection: IP67; verify cable entry, termination and material for the joint

Measuring Range: Up to 3 t technical reference; approve rated joint contacts

Description: Assess METRAVON MV-LC0007 for compact force-sensing joints. Check radial cable space, bearing contacts and bridge acquisition before requesting a matched load pin quote.

Product Details

METRAVON MV-LC0007 is a compact load pin with a bridge output and a technical range up to 3 t. The drawing shows a 114 +/-0.1 mm longitudinal reference and a cable connection that projects radially from the end region. It may suit a constrained joint only after bearing contacts, orientation and cable space are checked together. A short body does not establish that the complete connection will clear a nearby frame or guard.

Allow for more than the compact load pin body

The outline identifies three nominal diameter-40 regions, a diameter-50 end feature and a 114 +/-0.1 mm length reference. The cable entry projects below the body in the illustrated view. Include the gland, cable departure, movement and service access in the available-space check. Use the delivered tolerances and controlled datums when assessing the fit. Do not force the cable against a bracket to make the nominal body length fit, or rotate the pin solely to recover cable clearance.

MV-LC0007 compact pin drawing showing radial cable connection and F and F over 2 reaction directions
Up to 3 t with a 114 +/-0.1 mm longitudinal reference and radial cable exit. Plan a bridge reader and the complete installation clearance.

Check the illustrated reaction arrangement before making a keeper

Two F/2 reactions are shown above the pin and F below its central region. The actual loaded and supporting members must introduce force in the approved locations and direction. The notch and end details require a defined retention arrangement; their appearance is not a torque or clamp instruction. Show the mating members, bushes, gaps and axial stops in section. A keeper that changes the contact condition can affect the measurement even if the pin is securely held.

Provide a bridge acquisition path, not just a PLC process input

The documented channel is 1.0 +/-0.015 mV/V with 10-12 V DC excitation. It requires an appropriate weighing input or bridge conditioner capable of supplying excitation and reading the differential signal. The parameter table does not establish a direct 4-20 mA or CAN version for this model. If the control system needs such a signal, define an external conversion arrangement or obtain explicit product-specific option documentation; do not transfer another model electrical list into this selection.

ItemValueSelection notes
Technical load referenceUp to 3 tAgree the pin reaction and its approved contact arrangement.
Longitudinal reference114 +/-0.1 mmThis is not the complete radial cable-clearance envelope.
Body / end-feature references40 / 50 mm diametersCheck controlled tolerances and mating geometry.
Bridge sensitivity1.0 +/-0.015 mV/VRequires excitation and a suitable low-level signal input.
Excitation10-12 V DCDo not apply an assumed process-transmitter supply.
Documented output boundaryBridge outputDirect current or bus operation needs separate evidence.

Check the assembled response at the required low loads

Specify the useful reaction interval as well as the maximum, and agree a loading reference suitable for that interval. Precision is listed as 0.5% FS and temperature effect as 0.5% FS per 10 deg C. These entries should be considered alongside acquisition performance and temperatures at the pin. Repeat loaded measurements and check the unloaded return after securing the keeper and routing the cable. Correct an assembly-related zero change before relying on a new span adjustment.

Define exposure and maintenance access before ordering

Choose alloy steel or stainless steel for the actual joint environment and verify the IP67 arrangement with the cable entry and termination completed. The operating-temperature range is -40 to +85 deg C, not an assurance that the whole machine shares those limits. Include a safe way to support the joint during pin removal. The sensor 200% FS safe-load figure cannot be used to approve lifting hardware or to set an equipment proof-load procedure.

Enquire about MV-LC0007 with the compact joint section, cable-clearance envelope, useful reaction range and the proposed bridge reader or conditioner.

PLC inputs, clearance and keeper effects

Q1. Can this connect directly to a 4-20 mA PLC input?

The documented output is a millivolt-per-volt bridge, not a current loop. Use a suitable bridge input or a specified external conditioner and confirm excitation, scaling and calibration for the assembled system.

Q2. Does the 114 mm length settle whether the pin fits?

No. The radial cable entry, mating fit, support contacts and retaining parts also need space. Compare the complete installed envelope and removal path with the actual bracket.

Q3. Can the retaining notch be used to clamp away a changing zero?

Do not use clamping as an improvised calibration correction. Check the intended keeper contact and whether it adds restraint or changes bearing load. Resolve that mechanical cause before adjusting the reader.

Send Form