Quality Control

For industrial instrument quality control, the order must identify both the equipment configuration and the evidence required for acceptance. A powered display or a plausible reading is not enough to show that an instrument meets the application. The checks below help buyers specify inspection records for METRAVON equipment; the tests and documents included in a particular supply must be agreed in the quotation and order.

Check the supplied configuration first

Compare the nameplate and supplied equipment with the ordered model, measuring range, materials, process connection, power supply and output. Record serial numbers where provided. For a networked instrument, also record the firmware or software version and the communication settings relevant to the project. Resolve substitutions before installation rather than accepting a similar-looking unit.

A drawing establishes mechanical fit; a wiring diagram establishes terminal functions. Neither proves performance in the process. Keep these documents with the applicable data sheet and the agreed inspection requirements so that later replacements can be checked against the same configuration.

Match acceptance checks to the measurement

EquipmentChecks to specifyEvidence to retain
Radar level meterReference distance, mounting position, configured range, stability during relevant process conditions and agreement between local and received values.Reference method, instrument settings, process state and recorded readings. Retain echo information if the instrument provides it and it is needed for diagnosis.
Point-level switchSwitching and reset with the intended material, output state and the receiving system's response to the agreed alarm and fault conditions.Mounting and sensing position, material condition, settings, observed output states and alarm logic test results.
Weighing assemblyInstalled zero, response to an agreed reference load, repeatability, return to zero and any required loading-position checks.Reference loads or approved comparison method, loading sequence, readings, support condition and indicator configuration.
Gateway or RTUPower and port assignment, correct field values, units and scaling, data timing, restart and communication-loss recovery as required.Device list, wiring and register map, configuration version, timestamps and results at both the field device and receiving system.

Set numerical limits and test conditions in the project specification. A catalogue accuracy value should not be copied into a system acceptance criterion without checking the stated conditions, reference method and other sources of error. No single tolerance is appropriate for every level, weighing and data-acquisition project.

Separate bench checks from site acceptance

A bench check can identify an incorrect output setting or wiring error. It cannot reproduce every vessel obstruction, pipe force or radio coverage condition. For a radar installation, compare readings under the operating states that matter, such as filling or agitation. For weighing, test after the supports, piping and restraints are in their operating condition. For data acquisition, verify the complete path from the field signal through the gateway to the PLC, RTU or data logger that uses the value.

Use installation guides alongside the selected model's manual. If the process cannot be represented before shipment, define the site trial, responsibilities and acceptance method before purchase. Do not turn an untested application assumption into a performance guarantee.

Questions about inspection records

Q1. Are the same reports included with every instrument?

No common report package should be assumed. State whether the project needs a calibration record, functional test results, a configuration record or model-specific certificates. Confirm availability, document coverage and any additional cost before ordering. A general product brochure is not a test record for an individual unit.

Q2. Does a certificate for one model cover another model in the range?

Do not assume that it does. Check the document against the complete supplied model and variant, and review its stated conditions and limitations. Where project approval depends on a particular document, resolve any mismatch before ordering. A company-level document alone does not establish the performance or approval of each product.

Q3. What changes require the acceptance test to be reviewed?

Review changes to the measuring element, mounting arrangement, range, signal scaling or firmware that affects measurement or communication. A replacement can fit mechanically but use different output scaling. Record the differences and repeat the affected checks; retaining the previous acceptance result is insufficient if its tested configuration has changed.

Q4. What should a fault report contain?

Provide the model and serial number if available, installation photographs, wiring, relevant settings and the observed error with its operating conditions. Include a reference reading and timestamps where useful. For an intermittent problem, record whether it follows filling, vibration, washdown, power interruption or network loss. These details help distinguish an instrument fault from installation or integration problems.

Send the proposed inspection checklist and required documents with the product enquiry. Agree the reference method, acceptance limits and responsibility for each test before the equipment is supplied.